| Wall ConstructionMatt and Perry started framing the walls on July 19, 2005. Each of the outside four walls were built and lifted into place one at a time with wall jacks. Alan gave us a hand with the heavy south wall. Sid, Joyce, and Kodi helped on the weekend, and by July 27th, all the outside and inside walls were framed and in place.
|
|
|