Septic System
Back to
Project History 2005
Tag Wolf Construction install the septic tank and drain fields.
After the State and County inspections, Tag backfilled the tank. The
weekend of August 8th, Ray and Lynette delivered Ray's new tractor for us to use
on the project. It has forks, bucket, and Ray built a man lift for the
forks that came in real handy. We finished the drain mat around the
building, installed the drain pipe and drain rock so that we could backfill the
foundation while Ray was there to run his tractor.
Tag Wolf Construction installed the septic system and drain fields August 8th, 2005. There are two drain fields of 20 domes each. Tag backfilled the septic tank and the inspections were complete August 8th. We finished the foundation drain rock and drain mat. Ray and Lynette came to help with his new tractor. Sid, Joyce, and Forest helped again. It was a good day with all the help for backfilling the foundation. Ray and Perry used the tractors while the rest of the crew did the dirty work. Perry running Ray's rebuilt tractor to backfill the foundation. The foundation job was finished August 9th.
Tag Wolf Construction installed the septic system and drain fields August 8th, 2005.