The shop room ceiling was finished with ceiling tile trimmed with pine strips. |
|
|
|
|
|
|
|
|
|
|
|
|
Perry replaced his table saw with a new Grizzly 3 hp 220 volt saw in February 2003. |
|
|
|
|
|
|
|
|
|
|
|
|
New Grizzly 3 hp 220 volt tablesaw. |
|
|
|
|
|
|
|
|
|
|
|
|
Perry and Kodi purchased a new utility trailer in March 2003. |
|
|
|
|
|
|
|
|
|
|
|
|
The trailer will be used at the cabin. |
|
|
|
|
|
|
|
|
|
|
|
|
We the trailer to transport brush and tree branched to the dump. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Perry worked on finishing the upstairs with insulation. |
|
|
|
|
|
|
|
|
|
|
|
|
Started on the rock wall in front of the garage. |
|
|
|
|
|
|
|
|
|
|
|
|
The stacked rock wall will all serve as a loading ramp for the bikes. |
|
|
|
|
|
|
|
|
|
|
|
|
We will lay the river rock using a stacking method with mortar. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Rock retaining wall. September 02, 2003. |
|
|
|
|
|
|
|
|
|
|
|
|
We are about half way done with the rock retaining wall. September 02, 2003. |
|
|
|
|
|
|
|
|
|
|
|
|
Kodi worked on finishing the rock retaining wall in from of the shop. |
|
|
|
|
|
|
|
|