Matt finished the king truss structures on the gable ends. |
|
|
|
|
|
|
|
|
|
|
|
|
King truss structures on the east gable ends. |
|
|
|
|
|
|
|
|
|
|
|
|
Alex liked the porch view. |
|
|
|
|
|
|
|
|
|
|
|
|
The west gable king truss were built for the windows. |
|
|
|
|
|
|
|
|
|
|
|
|
September 8, 2006. We finished the stairs to the loft. |
|
|
|
|
|
|
|
|
|
|
|
|
Most of the kitchen cabinets were installed in September 2006. |
|
|
|
|
|
|
|
|
|
|
|
|
The great room ceiling fan was installed. |
|
|
|
|
|
|
|
|
|
|
|
|
The loft bed room ceiling fan was installed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
The hardy board gable ends shingles were also installed in September 2006. |
|
|
|
|
|
|
|
|
|
|
|
|
|
The siding was installed. |
|
|
|
|
|
|
|
|
|
|
|
|
The cabin outside timbers and posts were sealed and ready for winter. |
|
|
|
|
|
|
|
|
|