Project History 2006

Back to Project History

The project is now complete and the closing of the construction loan is finished.  All of the inspections, plumbing, propane lines, electrical, HVAC, and building were complete.  Carpet, tile, bath and kitchen fixtures and installed, and we closed on the cabin July 1, 2006.  There is still work to do in finishing the molding, custom cabinets for the master bedroom and hallway, but we are moved in and enjoying the summer views.

Construction Events:

Jan 18, 2006

Stairs and Loft

April 18, 2006

Painting and Cabinets

Feb 14, 2006

Insulation and Sheetrock

July 1, 2006

Finish and Closing

         

 

Matt finished the king truss structures on the gable ends.

King truss structures on the east gable ends.

Alex liked the porch view.

The west gable king truss were built for the windows.

September 8, 2006. We finished the stairs to the loft.

Most of the kitchen cabinets were installed in September 2006.

The great room ceiling fan was installed.

The loft bed room ceiling fan was installed.

Loft ceiling fan.

The hardy board gable ends shingles were also installed in September 2006.

Hardy board shingles.

The siding was installed.

The cabin outside timbers and posts were sealed and ready for winter.

Winter came.

 

Back to top